Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Presplitting technique cuts blasting problems
On 4.5 mi stretch of four-lane highway near Marathon, NY, shale and sandstone formation was presplit with presplit and production holes drilled to 30-ft bench level simultaneously and blasting done in two lifts; holes 3-in. diam were drilled 36-in. c to c at slope of 1.5 on 1 primed with two 2×16 in. DuPont Toval dynamite and deck loaded with 1.25×8 in. 1/2 lb sticks of DuPont 40% special gelatin C; production holes were filled 6 to 7 ft from top with ammonium nitrate and 6%-by weight of No. 2 diesel fuel oil.
Presplitting technique cuts blasting problems
On 4.5 mi stretch of four-lane highway near Marathon, NY, shale and sandstone formation was presplit with presplit and production holes drilled to 30-ft bench level simultaneously and blasting done in two lifts; holes 3-in. diam were drilled 36-in. c to c at slope of 1.5 on 1 primed with two 2×16 in. DuPont Toval dynamite and deck loaded with 1.25×8 in. 1/2 lb sticks of DuPont 40% special gelatin C; production holes were filled 6 to 7 ft from top with ammonium nitrate and 6%-by weight of No. 2 diesel fuel oil.
Presplitting technique cuts blasting problems
Construction Method Equipment
Rhein, R.R. (Autor:in)
1965
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Presplitting : A controlled blasting technique for rock cuts
TIBKAT | 1966
|Presplitting cuts clean faces at two tough rock jobs
Engineering Index Backfile | 1963
|NTIS | 1974
|DOAJ | 2018
|Presplitting Techniques in Rock Excavation
NTIS | 1965
|