Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fundamental studies on hydraulic sand-filling
Study was made of behavior of drainage from hydraulic sand-filling, changing heights of filled sand and places of drainage bulkheads, using model constructed from pipes and wire gauze; filling tank 250 cm high, 80 cm long and 50 cm wide, was built based on consideration that height of filling tank should be higher than height of original capillary rise in sand fill. In Japanese with English abstract.
Fundamental studies on hydraulic sand-filling
Study was made of behavior of drainage from hydraulic sand-filling, changing heights of filled sand and places of drainage bulkheads, using model constructed from pipes and wire gauze; filling tank 250 cm high, 80 cm long and 50 cm wide, was built based on consideration that height of filling tank should be higher than height of original capillary rise in sand fill. In Japanese with English abstract.
Fundamental studies on hydraulic sand-filling
Min Met Inst Japan -- J
Horibe, T. (Autor:in) / Kobayashi, R. (Autor:in) / Murakami, T. (Autor:in)
1965
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydraulic filling of tailings with a limited sand content
Springer Verlag | 1970
|Hydraulic filling of tailings with a limited sand content
Online Contents | 1970
|Bag sand well sand filling device and sand filling method
Europäisches Patentamt | 2015
|Engineering Index Backfile | 1959
|Large-thickness hydraulic filling sand inner drainage plate cutting device and method
Europäisches Patentamt | 2023
|