Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Coffer dam and concrete mixer at Mare Island Dry Dock, California
A brief description of this large coffer dam which stood about 12 years, is abstracted from a paper by Otto V. Geldern in the Trans. Tech. Soc. Pac. Coast.
Coffer dam and concrete mixer at Mare Island Dry Dock, California
A brief description of this large coffer dam which stood about 12 years, is abstracted from a paper by Otto V. Geldern in the Trans. Tech. Soc. Pac. Coast.
Coffer dam and concrete mixer at Mare Island Dry Dock, California
Eng News
Geldern, Otto V. (Autor:in)
1891
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The dry dock and Coffer dam at Mare Island, Cal.
Engineering Index Backfile | 1892
|Coffer dams in reinforced concrete
Engineering Index Backfile | 1905
|Partial failure of coffer dam, new dry dock, Boston navy yard
Engineering Index Backfile | 1900
|Coffer time: The development of the English coffer over the centuries
British Library Online Contents | 1999
Coffer dam and floating caissons
Engineering Index Backfile | 1890
|