A platform for research: civil engineering, architecture and urbanism
Coffer dam and concrete mixer at Mare Island Dry Dock, California
A brief description of this large coffer dam which stood about 12 years, is abstracted from a paper by Otto V. Geldern in the Trans. Tech. Soc. Pac. Coast.
Coffer dam and concrete mixer at Mare Island Dry Dock, California
A brief description of this large coffer dam which stood about 12 years, is abstracted from a paper by Otto V. Geldern in the Trans. Tech. Soc. Pac. Coast.
Coffer dam and concrete mixer at Mare Island Dry Dock, California
Eng News
Geldern, Otto V. (author)
1891
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The dry dock and Coffer dam at Mare Island, Cal.
Engineering Index Backfile | 1892
|Coffer dams in reinforced concrete
Engineering Index Backfile | 1905
|Partial failure of coffer dam, new dry dock, Boston navy yard
Engineering Index Backfile | 1900
|Coffer time: The development of the English coffer over the centuries
British Library Online Contents | 1999
Coffer dams and floating caissons
Engineering Index Backfile | 1891
|