Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Winter paving with asphaltic concrete on macadam base
Construction, under extreme exposure to cold, of asphalt pavement section of Leif Ericsson Drive along lake front in Chicago; 67,000 sq. yd. of 2-in. asphalt surfacing was laid in eight days; siv rollers, following on heels of extra-size spreading and raking crews, got asphalt down hot; mixture and mixing procedure; progress, working force. Before Ill. Soc. Engrs. (See also - editorial comment on pp. 429-430)
Winter paving with asphaltic concrete on macadam base
Construction, under extreme exposure to cold, of asphalt pavement section of Leif Ericsson Drive along lake front in Chicago; 67,000 sq. yd. of 2-in. asphalt surfacing was laid in eight days; siv rollers, following on heels of extra-size spreading and raking crews, got asphalt down hot; mixture and mixing procedure; progress, working force. Before Ill. Soc. Engrs. (See also - editorial comment on pp. 429-430)
Winter paving with asphaltic concrete on macadam base
Eng. News-Rec
Flood, W.H. (Autor:in)
Engineering News-Record ; 104
1930
3 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Asphaltic concrete on old macadam
Engineering Index Backfile | 1920
|Clinker asphaltic macadam, hounslow
Engineering Index Backfile | 1917
|Asphaltic concrete base makes possible rapid paving program
Engineering Index Backfile | 1923
|Asphaltic mixed macadam in Ontario
Engineering Index Backfile | 1929
|Asphaltic oil treatment of Macadam roads
Engineering Index Backfile | 1910
|