A platform for research: civil engineering, architecture and urbanism
Winter paving with asphaltic concrete on macadam base
Construction, under extreme exposure to cold, of asphalt pavement section of Leif Ericsson Drive along lake front in Chicago; 67,000 sq. yd. of 2-in. asphalt surfacing was laid in eight days; siv rollers, following on heels of extra-size spreading and raking crews, got asphalt down hot; mixture and mixing procedure; progress, working force. Before Ill. Soc. Engrs. (See also - editorial comment on pp. 429-430)
Winter paving with asphaltic concrete on macadam base
Construction, under extreme exposure to cold, of asphalt pavement section of Leif Ericsson Drive along lake front in Chicago; 67,000 sq. yd. of 2-in. asphalt surfacing was laid in eight days; siv rollers, following on heels of extra-size spreading and raking crews, got asphalt down hot; mixture and mixing procedure; progress, working force. Before Ill. Soc. Engrs. (See also - editorial comment on pp. 429-430)
Winter paving with asphaltic concrete on macadam base
Eng. News-Rec
Flood, W.H. (author)
Engineering News-Record ; 104
1930
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Asphaltic concrete on old macadam
Engineering Index Backfile | 1920
|Clinker asphaltic macadam, hounslow
Engineering Index Backfile | 1917
|Asphaltic concrete base makes possible rapid paving program
Engineering Index Backfile | 1923
|Asphaltic mixed macadam in Ontario
Engineering Index Backfile | 1929
|Asphaltic oil treatment of Macadam roads
Engineering Index Backfile | 1910
|