La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
Construction of concrete-lined pressure tunnel, of 5 m max diam, 9 km long, for Mezzocorona hydroelectric power plant on Noce River; study of geological structure of site; construction of reinforced-concrete conduits, up to 5 m in internal diam, bridging creeks and ravines and operating under heads up to 23 m; silt control by Dufour system.
La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
Construction of concrete-lined pressure tunnel, of 5 m max diam, 9 km long, for Mezzocorona hydroelectric power plant on Noce River; study of geological structure of site; construction of reinforced-concrete conduits, up to 5 m in internal diam, bridging creeks and ravines and operating under heads up to 23 m; silt control by Dufour system.
La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
De Riccabona, C. (Autor:in)
1932
10 pages
Aufsatz (Zeitschrift)
Spanisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Note sul canale dell'impianto idroelettrico di mori sull'adige
Engineering Index Backfile | 1932
|Un'Arcata di 90 Metri sul Torrente Biedano
Engineering Index Backfile | 1937
|Riccardo Morandi Viadotto sul torrente Polcevera, Genova
British Library Online Contents | 2005
Un'Arcata di 90 Metri sul Torrente Biedano
Engineering Index Backfile | 1937
|