A platform for research: civil engineering, architecture and urbanism
La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
Construction of concrete-lined pressure tunnel, of 5 m max diam, 9 km long, for Mezzocorona hydroelectric power plant on Noce River; study of geological structure of site; construction of reinforced-concrete conduits, up to 5 m in internal diam, bridging creeks and ravines and operating under heads up to 23 m; silt control by Dufour system.
La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
Construction of concrete-lined pressure tunnel, of 5 m max diam, 9 km long, for Mezzocorona hydroelectric power plant on Noce River; study of geological structure of site; construction of reinforced-concrete conduits, up to 5 m in internal diam, bridging creeks and ravines and operating under heads up to 23 m; silt control by Dufour system.
La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
La galleria in pressione dell'impianto di Mezzocorona sul torrente Noce
De Riccabona, C. (author)
1932
10 pages
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Un'Arcata di 90 Metri sul Torrente Biedano
Engineering Index Backfile | 1937
|Note sul canale dell'impianto idroelettrico di mori sull'adige
Engineering Index Backfile | 1932
|Riccardo Morandi Viadotto sul torrente Polcevera, Genova
British Library Online Contents | 2005
Un'Arcata di 90 Metri sul Torrente Biedano
Engineering Index Backfile | 1937
|