Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Feb n 8 20 p 315-319: Extension to connect Great Northern with Western Pacific at Bieber in California, gave rise to unusual problems; bridge work; location of new line between Klamath Falls and Bieber; track-laying schedule; terminal facilities; total cost $6,500,000. Feb 27 n 9 p 352-355: Thorough surveys expedite construction; construction problems in heavily timbered country; roadway standards; service facilities; map giving location of new line between Keddie and Bieber.
Feb n 8 20 p 315-319: Extension to connect Great Northern with Western Pacific at Bieber in California, gave rise to unusual problems; bridge work; location of new line between Klamath Falls and Bieber; track-laying schedule; terminal facilities; total cost $6,500,000. Feb 27 n 9 p 352-355: Thorough surveys expedite construction; construction problems in heavily timbered country; roadway standards; service facilities; map giving location of new line between Keddie and Bieber.
Builds 112-mile line in 15 months
Ry Age
Phillips, T.L. (Autor:in)
Railway Age ; 92
1932
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Michigan builds expressway costing $2,000,000 a mile
Engineering Index Backfile | 1944
Massachusetts builds 123-mile cross-state toll road
Engineering Index Backfile | 1955
|Santa Fe builds 49-mile cut-off in Kansas
Engineering Index Backfile | 1923
Mid-America Pipeline Builds Respect on 400-Mile Loop
Online Contents | 1996
5-mile James river bridge built in 13 months
Engineering Index Backfile | 1929