Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
5-mile James river bridge built in 13 months
Tri-bridge and highway toll project connecting Newport News with Norfolk built on concrete trestles of precast piles 35 to 115 ft. long; simple design permits rapid repetitive construction methods; design of I-beam spans; 43 ft. 9 in. long; deep-water piers; lift span of 300 ft.; and two bascule spans of double-leaf rolling type 110 ft. center to center of rolling axes; construction schedule; pile forms; pile-yard mixing plant; pile driving and trestle building; deck forms; deep pier construction; steel erection; floating concrete plant; floating equipment. See editorial comment on p. 51.
5-mile James river bridge built in 13 months
Tri-bridge and highway toll project connecting Newport News with Norfolk built on concrete trestles of precast piles 35 to 115 ft. long; simple design permits rapid repetitive construction methods; design of I-beam spans; 43 ft. 9 in. long; deep-water piers; lift span of 300 ft.; and two bascule spans of double-leaf rolling type 110 ft. center to center of rolling axes; construction schedule; pile forms; pile-yard mixing plant; pile driving and trestle building; deck forms; deep pier construction; steel erection; floating concrete plant; floating equipment. See editorial comment on p. 51.
5-mile James river bridge built in 13 months
Eng. News-Rec
Engineering News Record ; 102
1929
7 pages
13 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Builds 112-mile line in 15 months
Engineering Index Backfile | 1932
|Repairing James River bridge system
Engineering Index Backfile | 1956
|Five-mile seawall built on precast piles
Engineering Index Backfile | 1932
|$7,000,000 James river bridge project
Engineering Index Backfile | 1928