Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Sept 24: Design and construction of docking pier at Verdon in estuary of Gironde River, on west coast of France; construction of viaduct 372 m long, 15.5 m wide, resting on double row of concrete piers, leading to landing dock which is 317 m long, 38 m wide. Oct 1: Equipment and methods used in concreting and in handling of steel members. (See also Genie Civil and 14 v 101 n 13 p 322-7)
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Sept 24: Design and construction of docking pier at Verdon in estuary of Gironde River, on west coast of France; construction of viaduct 372 m long, 15.5 m wide, resting on double row of concrete piers, leading to landing dock which is 317 m long, 38 m wide. Oct 1: Equipment and methods used in concreting and in handling of steel members. (See also Genie Civil and 14 v 101 n 13 p 322-7)
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Chalon, P.A. (Autor:in)
1932
35 pages
Supp plate
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Engineering Index Backfile | 1932
|Aménagement de l'estuaire de la Gironde
Online Contents | 2010
|Aménagement de l'estuaire de la Gironde
Online Contents | 2010
|DOAJ | 2017
|DOAJ | 2017
|