Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Sept 24 n 13 p 293-299: Design and construction of docking pier at Verdon in estuary of Gironde River, on west coast of France; Construction of viaduct 372 m long, 15.5 m wide, resting on double row of concrete piers, leading to landing dock which is 317 m long, 38 m wide. Oct 1 n 14 p 322-327: Equipment and methods used in concreting and in handling of steel members. (See also similar article in Societe Ingenieurs Civils de France -- Memoires et C R des Travaux v 9 n 3/4 Mar-Apr 1932 p 383-417 supp plate)
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Sept 24 n 13 p 293-299: Design and construction of docking pier at Verdon in estuary of Gironde River, on west coast of France; Construction of viaduct 372 m long, 15.5 m wide, resting on double row of concrete piers, leading to landing dock which is 317 m long, 38 m wide. Oct 1 n 14 p 322-327: Equipment and methods used in concreting and in handling of steel members. (See also similar article in Societe Ingenieurs Civils de France -- Memoires et C R des Travaux v 9 n 3/4 Mar-Apr 1932 p 383-417 supp plate)
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Chalon, P.A. (Autor:in)
Genie Civil ; 101
1932
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Les travaux du mole d'escale du Verdon dans l'estuaire de la Gironde
Engineering Index Backfile | 1932
|Aménagement de l'estuaire de la Gironde
Online Contents | 2010
|Aménagement de l'estuaire de la Gironde
Online Contents | 2010
|DOAJ | 2017
|DOAJ | 2017
|