Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Speedy erection of parallel-strand cable bridge
Construction of suspension bridge having span of 1060 ft over Ohio River, at Maysville, Ky; towers 165 ft high were erected in eight days and cables in nine days, using footbridges; aluminum fillers transform hexagonal cable to 13-in. circle for wrapping.
Speedy erection of parallel-strand cable bridge
Construction of suspension bridge having span of 1060 ft over Ohio River, at Maysville, Ky; towers 165 ft high were erected in eight days and cables in nine days, using footbridges; aluminum fillers transform hexagonal cable to 13-in. circle for wrapping.
Speedy erection of parallel-strand cable bridge
Eng News-Rec
Engineering News-Record ; 108
1932
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Speedy erection of suspension bridge
Engineering Index Backfile | 1935
|Suspension bridge main cable strand erection restraining method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|