Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Boring and pile driving into permafrost
Methods of experimental driving of piles and boring of holes employed in Vorkuta, Soviet Siberia; soils of site were represented by silty loams of upper and lower moraines containing gravel and pebbles measuring 2 to 4 cm, in quantity from 20 to 40%; there were no large ice inclusions, total water content was 20 to 25%; soil temperature at depth of 4 to 8 m was -0.7 to -1 C; study showed that to drive piles directly into permafrost it is most effective to use percussive method, in particular, diesel hammer. (English translation of Osnovaniya, Fundamenty i Mekhanika Gruntov) (03490)
Boring and pile driving into permafrost
Methods of experimental driving of piles and boring of holes employed in Vorkuta, Soviet Siberia; soils of site were represented by silty loams of upper and lower moraines containing gravel and pebbles measuring 2 to 4 cm, in quantity from 20 to 40%; there were no large ice inclusions, total water content was 20 to 25%; soil temperature at depth of 4 to 8 m was -0.7 to -1 C; study showed that to drive piles directly into permafrost it is most effective to use percussive method, in particular, diesel hammer. (English translation of Osnovaniya, Fundamenty i Mekhanika Gruntov) (03490)
Boring and pile driving into permafrost
Soil Mech Found Eng
Vyalov, S.S. (Autor:in) / Targulyan, Yu.O. (Autor:in)
1968
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Boring and pile driving into permafrost
Online Contents | 1968
|PILE DRIVING BORING JIG AND PILE DRIVING BORING METHOD
Europäisches Patentamt | 2017
|Boring Piles and a New Design of Pile-Driving Machine
British Library Online Contents | 1996
|Boring piles and a new design of pile-driving machine
Online Contents | 1996
|Pile construction in permafrost
Engineering Index Backfile | 1959
|