Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Buffalo water works intake tunnel
Information relating to the construction of this tunnel, begun in July, 1895, and finished in Nov., 1897, at a cost of $90,000. (1200 w.)
Buffalo water works intake tunnel
Information relating to the construction of this tunnel, begun in July, 1895, and finished in Nov., 1897, at a cost of $90,000. (1200 w.)
Buffalo water works intake tunnel
Eng Rec
1897
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The construction of the Buffalo water works tunnel and intake crib
Engineering Index Backfile | 1911
|The new Buffalo water-works tunnel
Engineering Index Backfile | 1910
|Wiley | 1927
|Engineering Index Backfile | 1927
|Wiley | 1937
|