A platform for research: civil engineering, architecture and urbanism
Buffalo water works intake tunnel
Information relating to the construction of this tunnel, begun in July, 1895, and finished in Nov., 1897, at a cost of $90,000. (1200 w.)
Buffalo water works intake tunnel
Information relating to the construction of this tunnel, begun in July, 1895, and finished in Nov., 1897, at a cost of $90,000. (1200 w.)
Buffalo water works intake tunnel
Eng Rec
1897
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The construction of the Buffalo water works tunnel and intake crib
Engineering Index Backfile | 1911
|The new Buffalo water-works tunnel
Engineering Index Backfile | 1910
|Wiley | 1927
|Engineering Index Backfile | 1927
|Wiley | 1937
|