Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stone filled concrete pier
Details of method for hastening the work of construction of the Cascade Bridge of Burlington, Iowa. (500 w.)
Stone filled concrete pier
Details of method for hastening the work of construction of the Cascade Bridge of Burlington, Iowa. (500 w.)
Stone filled concrete pier
Eng News
1896
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Prefabricated assembled concrete-filled steel tube pier
Europäisches Patentamt | 2024
|Concrete-filled steel tube assembled and combined pier column
Europäisches Patentamt | 2024
|Metamaterial concrete filled steel tube pier and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|