A platform for research: civil engineering, architecture and urbanism
Stone filled concrete pier
Details of method for hastening the work of construction of the Cascade Bridge of Burlington, Iowa. (500 w.)
Stone filled concrete pier
Details of method for hastening the work of construction of the Cascade Bridge of Burlington, Iowa. (500 w.)
Stone filled concrete pier
Eng News
1896
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Metamaterial concrete filled steel tube pier and construction method
European Patent Office | 2024
|Concrete-filled steel tube assembled and combined pier column
European Patent Office | 2024
|European Patent Office | 2024
|