Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cofferdam construction on lower Arkansas
Features of massive program of planning, design and construction of cofferdams on Lower Arkansas River; general discussion of factors which govern design of cofferdams, construction procedures at various sites, and detailed resume on activities of one contractor with regard to cofferdam construction; difficulties were encountered with driving of sheet piles, their extraction, and in relocating river flow; additional difficulties are expected during repeated relocation of river.
Cofferdam construction on lower Arkansas
Features of massive program of planning, design and construction of cofferdams on Lower Arkansas River; general discussion of factors which govern design of cofferdams, construction procedures at various sites, and detailed resume on activities of one contractor with regard to cofferdam construction; difficulties were encountered with driving of sheet piles, their extraction, and in relocating river flow; additional difficulties are expected during repeated relocation of river.
Cofferdam construction on lower Arkansas
ASCE -- Prepr
White, R.D. (Autor:in) / Marlow, J.W. (Autor:in)
ASCE Environmental Engineering Conference ; 1967
1967
42 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|Adjustable cofferdam structure and cofferdam construction method
Europäisches Patentamt | 2023
|Combined cofferdam and construction method of combined cofferdam
Europäisches Patentamt | 2023
|Fabricated cofferdam structure and cofferdam construction method
Europäisches Patentamt | 2023
|