Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Instant rehab not so instant
Outline of apartment house rehabilitation in New York City using prefabricated Kitchen-bathroom units; after buildings are stripped down to masonry walls, exposed joists and subflooring units are dropped in and set one on top of each other; floors are shored up by screw jacks until cores are finally in place; during operation floor levels of units have been higher than sunken subfloors in building; together with gas heaters cost of renovating tenement buildings will average about 13,000 dollars/apartment.
Instant rehab not so instant
Outline of apartment house rehabilitation in New York City using prefabricated Kitchen-bathroom units; after buildings are stripped down to masonry walls, exposed joists and subflooring units are dropped in and set one on top of each other; floors are shored up by screw jacks until cores are finally in place; during operation floor levels of units have been higher than sunken subfloors in building; together with gas heaters cost of renovating tenement buildings will average about 13,000 dollars/apartment.
Instant rehab not so instant
Arch Rec
Architectural Record ; 141
1967
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 2008
|British Library Online Contents | 2007
Online Contents | 2001
|INSTANT HEATING UNIT, TOILET AND INSTANT HEATING METHOD
Europäisches Patentamt | 2022
|Online Contents | 2003