Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of new quay at lock entrance Albert Edward Dock, North Shields
General description; clearance work; reinforced concrete quay work; turning of piles for inspection; pile driving; loading; transit shed.
Construction of new quay at lock entrance Albert Edward Dock, North Shields
General description; clearance work; reinforced concrete quay work; turning of piles for inspection; pile driving; loading; transit shed.
Construction of new quay at lock entrance Albert Edward Dock, North Shields
Dock Harbour Authority
Porter, R.B. (Autor:in)
1939
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New quay at lock entrance, albert edward dock, north shields
Engineering Index Backfile | 1938
|New quay at lock entrance, albert edward dock, north shields
Engineering Index Backfile | 1938
|Construction of new quay at lock entrance Albert Edward Dock, North Shields
Engineering Index Backfile | 1939
|New quay at Albert Edward dock on the tyne
Engineering Index Backfile | 1928
Tyne commission quay, north shields
Engineering Index Backfile | 1930
|