Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erection of callender-Hamilton unit-construction bridges
Method consists of erecting bridge on pair of temporary rails on one side of gap to be spanned and skidding it on these rails across gap; bridge erected in demonstration was of single depth single truss type; that is, plain Warren girder with vertical angles at center of each Vee.
Erection of callender-Hamilton unit-construction bridges
Method consists of erecting bridge on pair of temporary rails on one side of gap to be spanned and skidding it on these rails across gap; bridge erected in demonstration was of single depth single truss type; that is, plain Warren girder with vertical angles at center of each Vee.
Erection of callender-Hamilton unit-construction bridges
Engineering
Engineering ; 147
1939
3 pages
supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and uses of Callender-Hamilton unit construction bridges
Engineering Index Backfile | 1938
|Design and uses of Callender-Hamilton unit construction bridges
Engineering Index Backfile | 1938
|Tests of Callender-Hamilton unit-construction bridge
Engineering Index Backfile | 1937
Callender-Hamilton bridging system
Engineering Index Backfile | 1946
|Callender-Hamilton system temporary bridge
Engineering Index Backfile | 1936