Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tests of Callender-Hamilton unit-construction bridge
Tests carried out at Royal Engineer Experimental Bridging Establishment, on 140-ft double truss bridge made on Callender-Hamilton system, consisting of special form of Warren truss, chords and diagonals of which are composed of 6-in. by 6-in. by 3/8-in. angles in 10-ft lengths.
Tests of Callender-Hamilton unit-construction bridge
Tests carried out at Royal Engineer Experimental Bridging Establishment, on 140-ft double truss bridge made on Callender-Hamilton system, consisting of special form of Warren truss, chords and diagonals of which are composed of 6-in. by 6-in. by 3/8-in. angles in 10-ft lengths.
Tests of Callender-Hamilton unit-construction bridge
Engineering
Engineering ; 143
1937
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Callender-Hamilton system temporary bridge
Engineering Index Backfile | 1936
Erection of callender-Hamilton unit-construction bridges
Engineering Index Backfile | 1939
Callender-Hamilton type cable bridge at Uxbridge
Engineering Index Backfile | 1937
Design and uses of Callender-Hamilton unit construction bridges
Engineering Index Backfile | 1938
|Design and uses of Callender-Hamilton unit construction bridges
Engineering Index Backfile | 1938
|