Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Extension of north mole at Leixoes harbour, Portugal
Design and construction of 1000 m of rubble mound breakwater, topped with concrete block weighing up to 90 tons; max depth to foundation 18 m; tests of protective effect of breakwaters; cost estimates.
Extension of north mole at Leixoes harbour, Portugal
Design and construction of 1000 m of rubble mound breakwater, topped with concrete block weighing up to 90 tons; max depth to foundation 18 m; tests of protective effect of breakwaters; cost estimates.
Extension of north mole at Leixoes harbour, Portugal
Dock Harbour Authority
Abecasis, D. (Autor:in)
1939
5 pages
Supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
4.4 Overtopping reduction at Leixoes Harbour, Portugal
British Library Conference Proceedings | 2005
|Massive interlocking blocks for harbour mole
Engineering Index Backfile | 1962
A Brief Account of the Building of Leixoes Harbor
ASCE | 2021
|Harbour control tower, Lisbon, Portugal
British Library Online Contents | 2002
|