Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method of draining foundation site and construction of concrete cut-off walls; grouting methods.
Method of draining foundation site and construction of concrete cut-off walls; grouting methods.
Foundation for cobble mountain dam
Pub. Works
Hatch, H.H. (Autor:in)
Public Works ; 61
1930
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1929
|Tunnel driving at cobble mountain
Engineering Index Backfile | 1931
|Tunnel grouting at Cobble Mountain
Engineering Index Backfile | 1932
|Tunnel blasting at cobble mountain
Engineering Index Backfile | 1930
|