Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hydro construction costs reduced
Construction plant minimized in erecting Waterville dam; diversion sluices useful on Osage project for Union Electric Light and Power Co.; generator repair pedestal saves in hydro construction; precast dam closes narrow channel.
Hydro construction costs reduced
Construction plant minimized in erecting Waterville dam; diversion sluices useful on Osage project for Union Electric Light and Power Co.; generator repair pedestal saves in hydro construction; precast dam closes narrow channel.
Hydro construction costs reduced
Elec. World
Electrical World ; 96
1930
2 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ingenious construction kinks reduced costs on the foshay tower
Engineering Index Backfile | 1929
Engineering Index Backfile | 1966
Engineering Index Backfile | 1953
|The construction of hydro-aeroplanes
Engineering Index Backfile | 1913
|LEADING DEVELOPMENTS - Aluminum Producer Hydro Restructures to Cut Costs
Online Contents | 2004