Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Suisun bay bridge for Southern Pacific Co
Progress and construction methods on $12,000,000 railroad project, including 1.35 mi. of south approach on fill, 5603 ft. of steel bridge on concrete piers, 1860 ft. of steel viaduct, etc.; steps in constructing deep-water piers; alternate sinking and erection of caisson sections; sealing and dewatering dredging wells; salvaging shell and cofferdam.
Suisun bay bridge for Southern Pacific Co
Progress and construction methods on $12,000,000 railroad project, including 1.35 mi. of south approach on fill, 5603 ft. of steel bridge on concrete piers, 1860 ft. of steel viaduct, etc.; steps in constructing deep-water piers; alternate sinking and erection of caisson sections; sealing and dewatering dredging wells; salvaging shell and cofferdam.
Suisun bay bridge for Southern Pacific Co
West. Construction News
Benjamin, H.I. (Autor:in)
1930
7 pages
16 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern pacific company's Suisun bay bridge
Engineering Index Backfile | 1930
|Southern pacific company's Suisun bay bridge
Engineering Index Backfile | 1930
|Suisun bay bridge for Southern Pacific Co
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
Martinez-benicia bridge, Suisun bay
Engineering Index Backfile | 1931