Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Southern pacific company's Suisun bay bridge
Double-track railroad bridge designed to take place of train ferry across Carquinez Straits between Benicia and Port Costa; length of bridge between abutments 5603.5 ft.; one 328 ft. vertical lift span provides clearance of 135 ft. above mean higher high water; discussion. Miscellaneous construction details, by N. F. Helmers. (See also Am. Soc. Civil Engrs. -- Proc part 1 Aug. 1930 pp. 1307-1317, 6 figs)
Southern pacific company's Suisun bay bridge
Double-track railroad bridge designed to take place of train ferry across Carquinez Straits between Benicia and Port Costa; length of bridge between abutments 5603.5 ft.; one 328 ft. vertical lift span provides clearance of 135 ft. above mean higher high water; discussion. Miscellaneous construction details, by N. F. Helmers. (See also Am. Soc. Civil Engrs. -- Proc part 1 Aug. 1930 pp. 1307-1317, 6 figs)
Southern pacific company's Suisun bay bridge
Ry. Age
Kirkbride, W.H. (Autor:in)
Railway Age ; 88
1930
7 pages
11 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern pacific company's Suisun bay bridge
Engineering Index Backfile | 1930
|Suisun bay bridge for Southern Pacific Co
Engineering Index Backfile | 1930
|Suisun bay bridge for Southern Pacific Co
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
North approach to suisun bay bridge for Southern Pacific Co. near Benicia, California
Engineering Index Backfile | 1930