Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Two heavy spans floated into place to complete Hackensack river bridges
One highway and two railroad structures in close proximity put into service by schedule involving shifting of navigation channel and removal of three old crossings; new bridges have vertical lift spans; design of new bridges; placing through-truss span, 245 ft. long, on 43-deg. skew; opening new channel.
Two heavy spans floated into place to complete Hackensack river bridges
One highway and two railroad structures in close proximity put into service by schedule involving shifting of navigation channel and removal of three old crossings; new bridges have vertical lift spans; design of new bridges; placing through-truss span, 245 ft. long, on 43-deg. skew; opening new channel.
Two heavy spans floated into place to complete Hackensack river bridges
Eng. News-Rec
Engineering News-Record ; 105
1930
3 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
Deep-water piers for Passaic and Hackensack river bridges
Engineering Index Backfile | 1913
Reconstructing failed Bascule bridge over Hackensack river
Engineering Index Backfile | 1930
|Paraguay sewer built of timber and floated into place
Engineering Index Backfile | 1946
Railroad girder spans jacked into place
Engineering Index Backfile | 1941
|