Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Kenova bridge end span erection
Two single-track 298-ft. spans, 100 ft. above water level, were replaced by double-track spans on substructure without interrupting traffic.
Kenova bridge end span erection
Two single-track 298-ft. spans, 100 ft. above water level, were replaced by double-track spans on substructure without interrupting traffic.
Kenova bridge end span erection
Public Works
Public Works ; 48
1920
3 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Kenova bridge intermediate spans
Engineering Index Backfile | 1920
Stonecutters Bridge-Main Span Erection
British Library Conference Proceedings | 2008
|Kenova bridge channel span erection
Engineering Index Backfile | 1920
Bridge span collapses during erection
Engineering Index Backfile | 1927
Double-span bridge girder erection machine and bridge erection construction method thereof
Europäisches Patentamt | 2023
|