Construction work of New Shimizu tunnel was started in Aug 1963 as link in chain of construction of additional track on Joetsu line, penetrating foot of Tanigawa-dake (1963 m in altitude) which stands over border of Gunma and Niigata prefectures; its total length is 13. 49 km; work in progress is expected to be completed in 1967; tunnel design, geology, and state of work executed are reported.
Construction work of New Shimizu tunnel was started in Aug 1963 as link in chain of construction of additional track on Joetsu line, penetrating foot of Tanigawa-dake (1963 m in altitude) which stands over border of Gunma and Niigata prefectures; its total length is 13. 49 km; work in progress is expected to be completed in 1967; tunnel design, geology, and state of work executed are reported.
Construction work of nw Shimizu tunnel
Japan Soc Civ Engrs -- J
Sugita, Y. (Autor:in)
1965
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 2004
Back-analysis of Shimizu Tunnel No. 3 by distinct element modeling
British Library Online Contents | 2007
|Back-analysis of Shimizu Tunnel No. 3 by distinct element modeling
Online Contents | 2007
|Back-analysis of Shimizu Tunnel No. 3 by distinct element modeling
Elsevier | 2006
|Color Scheme Project of The Port of Shimizu
British Library Online Contents | 2002
|