Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
May 3: General description of new line, 58 km. long, joining Midi Railway stationat Bedous with Jaca of Spanish Norte Railway; maximum gradient 1 in 23.2 with minimum curves of 200 m.; details of track and tunnel construction, including helicoidal tunnel 1972 yd. long with rise of 167 ft. or 1 in 29.4. May 24: Entrance of international Somport tunnel, which lies at summit of railway. June 7: Triangulation for tunnel; methods and equipment employed in driving tunnel on French and Spanish sides; nature of soil. June 21: Passenger station is made up of covered island platform 1214 ft. long, station buildings running down center; yard is laid out for 26 tracks; auxiliary freight shed is provided on both gages for local loading and unloading; electrification of line on French side from Bedous station, through tunnel to Canfranc station yard is carried out with direct current at 1500 volts; substation at Urdos has to deal with traffic on heavy gradients; details of electric locomotives. (See also Engineering, vol. 127, nos. 3303, 3306, 3308 and 3310, May, 3; 24 and June 7 and 21, 1929, pp. 541-544, 634-635, 713-716 and 782-784, 46 figs. partly on supp. plates)
May 3: General description of new line, 58 km. long, joining Midi Railway stationat Bedous with Jaca of Spanish Norte Railway; maximum gradient 1 in 23.2 with minimum curves of 200 m.; details of track and tunnel construction, including helicoidal tunnel 1972 yd. long with rise of 167 ft. or 1 in 29.4. May 24: Entrance of international Somport tunnel, which lies at summit of railway. June 7: Triangulation for tunnel; methods and equipment employed in driving tunnel on French and Spanish sides; nature of soil. June 21: Passenger station is made up of covered island platform 1214 ft. long, station buildings running down center; yard is laid out for 26 tracks; auxiliary freight shed is provided on both gages for local loading and unloading; electrification of line on French side from Bedous station, through tunnel to Canfranc station yard is carried out with direct current at 1500 volts; substation at Urdos has to deal with traffic on heavy gradients; details of electric locomotives. (See also Engineering, vol. 127, nos. 3303, 3306, 3308 and 3310, May, 3; 24 and June 7 and 21, 1929, pp. 541-544, 634-635, 713-716 and 782-784, 46 figs. partly on supp. plates)
The Transpyrenean railway via Canfranc
Engineer
Rich, T. (Autor:in)
Engineer ; 148
1929
2 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Transpyrenean railway via Canfranc
Engineering Index Backfile | 1929
|Dredging the Canfranc reservoir
British Library Conference Proceedings | 2006
|Long term measurement of the 222Rn concentration in the Canfranc Underground Laboratory
BASE | 2022
|RAILWAY POINTS, RAILWAY POINTS OPERATING APPARATUS AND RAILWAY TRACK CROSSING
Europäisches Patentamt | 2022
|RAILWAY POINTS, RAILWAY POINTS OPERATING APPARATUS AND RAILWAY TRACK CROSSING
Europäisches Patentamt | 2018
|