Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geological structure of site of embankment as revealed by borings up to 40 m. in depth; description of slide which caused failure of embankment in 1927; features of drainage system and of series of retaining walls and pile cut-offs, parallel to axis of embankment, built for insuring its stability; total cost of reconstruction 187, 500 marks.
Geological structure of site of embankment as revealed by borings up to 40 m. in depth; description of slide which caused failure of embankment in 1927; features of drainage system and of series of retaining walls and pile cut-offs, parallel to axis of embankment, built for insuring its stability; total cost of reconstruction 187, 500 marks.
Reconstruction of railroad embankment at bublitz in pomerania
Die Wiederherstellung des gerutschten Eisenbahndammes bei Bublitz in Pommern
Geittner (Autor:in)
1929
3 pages
5 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.