Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slip forms speed construction of concrete power house
Selection and use of Keller slip-form process for continuous placing of concrete enabled Bureau of Power and Light of City of Los Angeles, in nine 24-hour days, to pour superstructure of building at San Francisquito Power Plant No. 2.
Slip forms speed construction of concrete power house
Selection and use of Keller slip-form process for continuous placing of concrete enabled Bureau of Power and Light of City of Los Angeles, in nine 24-hour days, to pour superstructure of building at San Francisquito Power Plant No. 2.
Slip forms speed construction of concrete power house
Construction Methods
Allen, C.M. (Autor:in)
Construction Methods ; 11
1929
2 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Slip forms speed concrete placement on Tacoma mill
Engineering Index Backfile | 1948
|Slip forms speed circular grain bin construction by continuous concreting
Engineering Index Backfile | 1933
Slip forms speed circular grain bin construction by continuous concreting
Engineering Index Backfile | 1933
Slip forms for concrete canal lining
Engineering Index Backfile | 1952
|Using slip forms in winter construction
Engineering Index Backfile | 1929