Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Using slip forms in winter construction
Canvas covering over entire job, supported by dimension lumber, enabled builders to complete new $750,000 mill and elevator building of Ralston-Purina Co. at Denver, on time, in spite of several weeks of very cold weather and with weekly snows throughout construction; slipform system used was important factor in making time.
Using slip forms in winter construction
Canvas covering over entire job, supported by dimension lumber, enabled builders to complete new $750,000 mill and elevator building of Ralston-Purina Co. at Denver, on time, in spite of several weeks of very cold weather and with weekly snows throughout construction; slipform system used was important factor in making time.
Using slip forms in winter construction
Am. Contractor
1929
2 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Heaters ride slip forms on cement silo winter job
Engineering Index Backfile | 1947
Slip forms speed construction of concrete power house
Engineering Index Backfile | 1929
|Slip forms speed circular grain bin construction by continuous concreting
Engineering Index Backfile | 1933
Slip forms speed circular grain bin construction by continuous concreting
Engineering Index Backfile | 1933
Slip forms, elevator climb together
Engineering Index Backfile | 1949