Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reasons are given for use of steel instead of reinforced concrete for new winding tower of Kaiser Wilhelm shaft of Hohenzollern coal mine; one of main considerations was possibility of building new tower without interfering with use of existing steam winding equipment; clinker brickwork filling is used; two electric winding engines have sheaves of 21 1/2 ft. diam. and speed of 49 ft. per sec.
Reasons are given for use of steel instead of reinforced concrete for new winding tower of Kaiser Wilhelm shaft of Hohenzollern coal mine; one of main considerations was possibility of building new tower without interfering with use of existing steam winding equipment; clinker brickwork filling is used; two electric winding engines have sheaves of 21 1/2 ft. diam. and speed of 49 ft. per sec.
Steel-tower winding head frame
Das Turmfoerdergeruest auf dem Kaiser-Wilhelm-Schacht der Hohenzollerngrube
Walter, P. (Autor:in)
Glueckauf ; 65
1929
4 pages
3 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel tower head section mounting equipment and steel tower head section construction method
Europäisches Patentamt | 2024
|Tower cylinder modular frame structure, tower frame and tower cylinder structure
Europäisches Patentamt | 2021
|