Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
230-ft steel truss bridge at Camp Hood, Texas, was subjected to 12 charges, totaling 36 lb of TNT; 90% of steel was salvageable.
230-ft steel truss bridge at Camp Hood, Texas, was subjected to 12 charges, totaling 36 lb of TNT; 90% of steel was salvageable.
Tank destroyer pioneer demolition
Military Engr
Merritt, D.G. (Autor:in)
Military Engineer ; 36
1944
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1912
|