Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To provide a tank demolition method for demolishing a tank without using a large-scale facility.SOLUTION: A tank demolition method is for demolishing a tank 1 having a bottom plate 4 and a side wall 5 extending upward from the bottom plate 4, and includes: a support step for supporting a load from weight of the side wall 5 using a wedge part 8 installed between a foundation part 7 including the bottom plate 4 and the side wall 5, while the side wall 5 is separated from the bottom plate 4; and a lowering step for moving the wedge part 8 in a direction to pull out from the position between the foundation part 7 and the side wall 5 and then lowering the side wall 5. The wedge part 8 installed between the foundation part 7 and the side wall 5 supports the load from the weight of the side wall 5, and the side wall 5 is lowered by moving the wedge part 8 in the direction to pull out from the position between the foundation part 7 and the side wall 5. Therefore, the side wall 5 may be lowered while supporting the load from the weight of the side wall 5.SELECTED DRAWING: Figure 3
【課題】大掛かりな装置を用いることなくタンクを解体することが可能なタンク解体方法を提供する。【解決手段】タンク解体方法は、底板4と底板4から上方に延在する側壁5とを備えるタンク1を解体するタンク解体方法であって、側壁5が底板4から切り離された状態で、底板4を含む基礎部7と側壁5との間に設置された楔部8によって、側壁5の重量による荷重を支持する支持工程と、楔部8を基礎部7と側壁5との間から抜き出す方向に移動させ、側壁5を降下させる降下工程と、を備える。基礎部7と側壁5との間に設置された楔部8によって側壁5の重量による荷重を支持し、楔部8を基礎部7と側壁5との間から抜き出す方向に移動させることで側壁5を降下させる。したがって、側壁5の重量による荷重を支持した状態で、側壁5を降下させることができる。【選択図】図3
PROBLEM TO BE SOLVED: To provide a tank demolition method for demolishing a tank without using a large-scale facility.SOLUTION: A tank demolition method is for demolishing a tank 1 having a bottom plate 4 and a side wall 5 extending upward from the bottom plate 4, and includes: a support step for supporting a load from weight of the side wall 5 using a wedge part 8 installed between a foundation part 7 including the bottom plate 4 and the side wall 5, while the side wall 5 is separated from the bottom plate 4; and a lowering step for moving the wedge part 8 in a direction to pull out from the position between the foundation part 7 and the side wall 5 and then lowering the side wall 5. The wedge part 8 installed between the foundation part 7 and the side wall 5 supports the load from the weight of the side wall 5, and the side wall 5 is lowered by moving the wedge part 8 in the direction to pull out from the position between the foundation part 7 and the side wall 5. Therefore, the side wall 5 may be lowered while supporting the load from the weight of the side wall 5.SELECTED DRAWING: Figure 3
【課題】大掛かりな装置を用いることなくタンクを解体することが可能なタンク解体方法を提供する。【解決手段】タンク解体方法は、底板4と底板4から上方に延在する側壁5とを備えるタンク1を解体するタンク解体方法であって、側壁5が底板4から切り離された状態で、底板4を含む基礎部7と側壁5との間に設置された楔部8によって、側壁5の重量による荷重を支持する支持工程と、楔部8を基礎部7と側壁5との間から抜き出す方向に移動させ、側壁5を降下させる降下工程と、を備える。基礎部7と側壁5との間に設置された楔部8によって側壁5の重量による荷重を支持し、楔部8を基礎部7と側壁5との間から抜き出す方向に移動させることで側壁5を降下させる。したがって、側壁5の重量による荷重を支持した状態で、側壁5を降下させることができる。【選択図】図3
TANK DEMOLITION METHOD
タンク解体方法
YASUNAGA MASAMICHI (Autor:in)
05.07.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Tank destroyer pioneer demolition
Engineering Index Backfile | 1944
|Europäisches Patentamt | 2021
|