Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Long concrete and steel bridge raised 10 feet with gantry and jacks
Description of methods used in lifting 200-ton deck slabs and four continuous truss spans to clear backwater of TVA dam; illustrations given.
Long concrete and steel bridge raised 10 feet with gantry and jacks
Description of methods used in lifting 200-ton deck slabs and four continuous truss spans to clear backwater of TVA dam; illustrations given.
Long concrete and steel bridge raised 10 feet with gantry and jacks
Roads Streets
Haxby, C.D. (Autor:in)
Roads and Streets ; 86
1943
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
Raising a concrete girder bridge with screw jacks
Engineering Index Backfile | 1915
|Jacks on barge erect arch bridge
Engineering Index Backfile | 1958
|Bridge spans raised by gantry crane to clear new reservoir level
Engineering Index Backfile | 1943
Water mains raised eighteen feet
Engineering Index Backfile | 1886