Fifteen miles of 16-ft. concrete surface laid on existing clay-gravel road in eight months; describes construction methods; hand work reduced to a minimum and close analysis of weekly reports to secure maximum efficiency.
Fifteen miles of 16-ft. concrete surface laid on existing clay-gravel road in eight months; describes construction methods; hand work reduced to a minimum and close analysis of weekly reports to secure maximum efficiency.
Nashville-springhope highway
Public Wks
Skinner, F.W. (Autor:in)
Public Works ; 55
1924
5 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch