A platform for research: civil engineering, architecture and urbanism
Fifteen miles of 16-ft. concrete surface laid on existing clay-gravel road in eight months; describes construction methods; hand work reduced to a minimum and close analysis of weekly reports to secure maximum efficiency.
Fifteen miles of 16-ft. concrete surface laid on existing clay-gravel road in eight months; describes construction methods; hand work reduced to a minimum and close analysis of weekly reports to secure maximum efficiency.
Nashville-springhope highway
Public Wks
Skinner, F.W. (author)
Public Works ; 55
1924
5 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction methods on two highway bridges, Nashville, Tenn.
Engineering Index Backfile | 1909
Online Contents | 2003
Online Contents | 1997
Online Contents | 1997
Online Contents | 2000