Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geology and the decatur (Illinois) dam and reservoir project
Glacial formation explains why sheet piling could not be driven to intended depths; watertightness assured.
Geology and the decatur (Illinois) dam and reservoir project
Glacial formation explains why sheet piling could not be driven to intended depths; watertightness assured.
Geology and the decatur (Illinois) dam and reservoir project
Eng. News-Rec
Leighton, Morris M. (Autor:in)
1923
3 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The sewage disposal works of Decatur, Illinois
Engineering Index Backfile | 1928
|The Sewage Disposal Works of Decatur, Illinois
ASCE | 2021
|Filtration Plant, City of Decatur, Illinois
Wiley | 1915
|The sewage disposal works of decatur, Illinois
Engineering Index Backfile | 1930
|