How 36 double prime sewer mains were placed through quicksand and mud boils
High water table made excavation for sewer construction at Puyallup, Wash, extremely difficult; miniature movable cofferdam was used to keep water away from pipe laying operations; typical work stages illustrated.
How 36 double prime sewer mains were placed through quicksand and mud boils
High water table made excavation for sewer construction at Puyallup, Wash, extremely difficult; miniature movable cofferdam was used to keep water away from pipe laying operations; typical work stages illustrated.
How 36 double prime sewer mains were placed through quicksand and mud boils
Pacific Builder Engr
Sphar, L.L. (Autor:in)
1950
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Repairing sewer laid in quicksand
Engineering Index Backfile | 1945