A platform for research: civil engineering, architecture and urbanism
How 36 double prime sewer mains were placed through quicksand and mud boils
High water table made excavation for sewer construction at Puyallup, Wash, extremely difficult; miniature movable cofferdam was used to keep water away from pipe laying operations; typical work stages illustrated.
How 36 double prime sewer mains were placed through quicksand and mud boils
High water table made excavation for sewer construction at Puyallup, Wash, extremely difficult; miniature movable cofferdam was used to keep water away from pipe laying operations; typical work stages illustrated.
How 36 double prime sewer mains were placed through quicksand and mud boils
Pacific Builder Engr
Sphar, L.L. (author)
1950
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repairing sewer laid in quicksand
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1900
|Engineering Index Backfile | 1938
|ASCE | 2021
|Engineering Index Backfile | 1938
|