Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Report deals with head race gallery, head and tailrace tunnel of Curbans Project on Durance, immediately downstream from Serre-Poncon dam; underground plant includes pressure tunnel having finished section of 66.4 sq m, 9 km in length, cross section of which has continuous variable curvature; head works which, in addition to machine room, 80 m in length, include in particular surge tank 18 m in diam and 54 m in depth from which three penstocks 5 m in diam lead out, energy-dissipating shaft for 75 cu m/sec under 82 m of head and chamber connecting to tailrace tunnel, having span of 25 m; 1800 m free-flow tailrace tunnel having finished section of 90 sq m.
Report deals with head race gallery, head and tailrace tunnel of Curbans Project on Durance, immediately downstream from Serre-Poncon dam; underground plant includes pressure tunnel having finished section of 66.4 sq m, 9 km in length, cross section of which has continuous variable curvature; head works which, in addition to machine room, 80 m in length, include in particular surge tank 18 m in diam and 54 m in depth from which three penstocks 5 m in diam lead out, energy-dissipating shaft for 75 cu m/sec under 82 m of head and chamber connecting to tailrace tunnel, having span of 25 m; 1800 m free-flow tailrace tunnel having finished section of 90 sq m.
Underground works of Curbans Project
Les travaux souterrains de l'amenagement de Curbans
Riquois, R. (Autor:in)
1965
24 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
UNDERGROUND WORKS AT SRISAILAM HYDROPOWER PROJECT
British Library Conference Proceedings | 1998
|Underground Tunnelling Works with Tala Hydroelectric Project Authority
British Library Conference Proceedings | 2000
|Underground works on Third Nairobi Water Supply Project
British Library Conference Proceedings | 1994
|Wiley | 2023
|British Library Conference Proceedings | 2017
|