A platform for research: civil engineering, architecture and urbanism
Report deals with head race gallery, head and tailrace tunnel of Curbans Project on Durance, immediately downstream from Serre-Poncon dam; underground plant includes pressure tunnel having finished section of 66.4 sq m, 9 km in length, cross section of which has continuous variable curvature; head works which, in addition to machine room, 80 m in length, include in particular surge tank 18 m in diam and 54 m in depth from which three penstocks 5 m in diam lead out, energy-dissipating shaft for 75 cu m/sec under 82 m of head and chamber connecting to tailrace tunnel, having span of 25 m; 1800 m free-flow tailrace tunnel having finished section of 90 sq m.
Report deals with head race gallery, head and tailrace tunnel of Curbans Project on Durance, immediately downstream from Serre-Poncon dam; underground plant includes pressure tunnel having finished section of 66.4 sq m, 9 km in length, cross section of which has continuous variable curvature; head works which, in addition to machine room, 80 m in length, include in particular surge tank 18 m in diam and 54 m in depth from which three penstocks 5 m in diam lead out, energy-dissipating shaft for 75 cu m/sec under 82 m of head and chamber connecting to tailrace tunnel, having span of 25 m; 1800 m free-flow tailrace tunnel having finished section of 90 sq m.
Underground works of Curbans Project
Les travaux souterrains de l'amenagement de Curbans
Riquois, R. (author)
1965
24 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
UNDERGROUND WORKS AT SRISAILAM HYDROPOWER PROJECT
British Library Conference Proceedings | 1998
|Underground Tunnelling Works with Tala Hydroelectric Project Authority
British Library Conference Proceedings | 2000
|Underground works on Third Nairobi Water Supply Project
British Library Conference Proceedings | 1994
|Wiley | 2023
|British Library Conference Proceedings | 2017
|