Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building of Illinois Tower Co in Galesburg, Ill, was built in 1916, and modernized in 1953; plans to remodel building in 1964 included new suspended ceiling; design goal was to raise illumination to 150 ft-c by adding to existing luminaires -- at same time providing lighting system which would enhance looks of building inside and out; final solution found to problem is described; total cost for electrical rejuvenation of building was 11 thousand dollars.
Building of Illinois Tower Co in Galesburg, Ill, was built in 1916, and modernized in 1953; plans to remodel building in 1964 included new suspended ceiling; design goal was to raise illumination to 150 ft-c by adding to existing luminaires -- at same time providing lighting system which would enhance looks of building inside and out; final solution found to problem is described; total cost for electrical rejuvenation of building was 11 thousand dollars.
Modernization at reasonable cost
Illum Eng
Eagan, C.J. (Autor:in)
1966
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete building addition made at. reasonable cost
Engineering Index Backfile | 1919
More riders at less cost through modernization
Engineering Index Backfile | 1940
Wiley | 2020
|British Library Online Contents | 1995
|Seventh Circuit Implies Cost/Benefit Analysis Into Reasonable Accommodation Requirement
British Library Conference Proceedings | 1995
|