Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Headframe and ore bin at atomic energy's Jaduguda uranium mines built by slipform
Concreting of 45.45-m high cylindrical headframe tower and 13.5-m high ore bin at Jaduguda, India, uranium mines of Dept of Atomic Energy by using Swedish slipform technique is described; erection of shutter and slipform equipment for structure took two weeks and concreting was performed with average speed of 4.5 m/day.
Headframe and ore bin at atomic energy's Jaduguda uranium mines built by slipform
Concreting of 45.45-m high cylindrical headframe tower and 13.5-m high ore bin at Jaduguda, India, uranium mines of Dept of Atomic Energy by using Swedish slipform technique is described; erection of shutter and slipform equipment for structure took two weeks and concreting was performed with average speed of 4.5 m/day.
Headframe and ore bin at atomic energy's Jaduguda uranium mines built by slipform
Indian Concrete J
Torninger, T. (Autor:in) / Lindberg, P.G. (Autor:in)
1965
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Massive surge tank built by Slipform
Engineering Index Backfile | 1964
Headframe design and construction
Engineering Index Backfile | 1932
|200-ton pre-built headframe moved into position over shaft
Engineering Index Backfile | 1952