A platform for research: civil engineering, architecture and urbanism
Headframe and ore bin at atomic energy's Jaduguda uranium mines built by slipform
Concreting of 45.45-m high cylindrical headframe tower and 13.5-m high ore bin at Jaduguda, India, uranium mines of Dept of Atomic Energy by using Swedish slipform technique is described; erection of shutter and slipform equipment for structure took two weeks and concreting was performed with average speed of 4.5 m/day.
Headframe and ore bin at atomic energy's Jaduguda uranium mines built by slipform
Concreting of 45.45-m high cylindrical headframe tower and 13.5-m high ore bin at Jaduguda, India, uranium mines of Dept of Atomic Energy by using Swedish slipform technique is described; erection of shutter and slipform equipment for structure took two weeks and concreting was performed with average speed of 4.5 m/day.
Headframe and ore bin at atomic energy's Jaduguda uranium mines built by slipform
Indian Concrete J
Torninger, T. (author) / Lindberg, P.G. (author)
1965
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Massive surge tank built by Slipform
Engineering Index Backfile | 1964
Headframe design and construction
Engineering Index Backfile | 1932
|200-ton pre-built headframe moved into position over shaft
Engineering Index Backfile | 1952