Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Usual method of construction with moving or climbing forms is to continue concreting during 24-hr day; in war time, due to blackout conditions, moving form construction can only be carried out during hours of daylight; hence joint is made at end of each day's work; notes on difficulties encountered as result of this condition and means for their correction.
Usual method of construction with moving or climbing forms is to continue concreting during 24-hr day; in war time, due to blackout conditions, moving form construction can only be carried out during hours of daylight; hence joint is made at end of each day's work; notes on difficulties encountered as result of this condition and means for their correction.
Construction with moving formwork
Concrete Constr Eng
Hunter, L.E. (Autor:in)
1942
14 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction with moving formwork
Engineering Index Backfile | 1943
|Construction method of integrated upward moving formwork
Europäisches Patentamt | 2024
|Formwork support of outrigger construction formwork, construction formwork and construction method
Europäisches Patentamt | 2024
|